---
title: "How DFW Airport Uses Autodesk Construction Cloud for Capital Planning and Maintenance"
customer: "Autodesk"
customerWebsite: "https://www.autodesk.com/"
datePublished: 2026-10-07
dateModified: 2026-10-07
sourceAssetType: "guide"
topics: ["airport-infrastructure", "capital-planning", "digital-twin", "autodesk-construction-cloud"]
canonical: "https://theintelligencelibrary.com/autodesk/how-dfw-airport-uses-autodesk-construction-cloud-for-capital/"
---

# How DFW Airport Uses Autodesk Construction Cloud for Capital Planning and Maintenance

DFW Airport centralized design, construction, and asset data in Autodesk Construction Cloud to support capital planning and maintenance.

## Key takeaways

- DFW Airport uses Autodesk Construction Cloud to connect Autodesk Revit, Navisworks, Civil 3D, Autodesk Docs, Autodesk Build, and Autodesk Tandem in one tech stack.
- Standardized folders and Autodesk Validation Tool reviews help DFW Airport verify model quality before approved assets move into the digital twin.
- Real-time field access, photos, forms, RFIs, and issues save DFW Airport 10 hours a week on updates and 40 hours a week on data entry.
- Centralized asset data helps DFW Airport manage up to 160 concurrent projects and move toward predictive maintenance on its roadway and infrastructure assets.

## What scale of infrastructure and growth is DFW Airport managing?
DFW Airport is managing one of the largest airport footprints in the world, with nearly 80 million passengers a year, 257 destinations, 171 gates, seven active runways, 172 million square feet of pavement, 133 bridges, and 474 miles of water, sanitary sewer, and stormwater infrastructure. The campus is larger than Manhattan, and DFW Airport is the world’s third-largest land area and third-busiest airport for passengers and operations. Over the next decade, DFW Airport plans to support 20 million more passengers a year with $3.7 billion in infrastructure capital programs and $4.8 billion in expansion programs.

## How did DFW Airport create one source of truth for design, construction, and assets?
DFW Airport created one source of truth by adding Autodesk Construction Cloud to Autodesk Revit, Navisworks, and Civil 3D. Bill Grozdanich, VP Controls and Analytics, Infrastructure and Development at DFW Airport, said the airport needed one platform to get consistent data and asset information and understand who is doing what and where on a project. Autodesk Docs, Autodesk Build, and Autodesk Tandem then connect data from design to construction and into the digital twin so DFW Airport can operate and maintain built assets from the same record.

## How does DFW Airport coordinate hundreds of stakeholders and improve QA/QC?
DFW Airport coordinates contractors, designers, engineers, and partners by giving unlimited users access in Autodesk Construction Cloud and setting permissions by role. DFW Airport trains designers to use a standardized folder structure in Autodesk Docs so models are organized correctly from day one. After submission, the design team rates each model against DFW Airport standards with the Autodesk Validation Tool. If the rating is below standard, the model goes back to the designer for correction and resubmission. Once a model is approved, DFW Airport imports it into Autodesk Build and Autodesk Tandem so the asset record stays aligned. Breanna Brown, UAS Program Coordinator at VRX, described the review load as similar to being an air traffic controller, but said Autodesk Docs and the Validation Tool make it easier to sort, filter, review, and respond directly to designers. Kendra Jackson, QA/QC Administrator at TQD Group, said Autodesk Build gives general and specialty contractors real-time information so they can react immediately and reduce miscommunication.

## What operational time savings did DFW Airport see with Autodesk Build?
DFW Airport used Autodesk Build to reduce coordination time across as many as 160 projects at once on its 27-square-mile property. The airport says quickly finding and referencing updates from photos saves at least 10 hours a week by eliminating emails and phone calls. Mobile access to models, forms, issues, and RFIs saves 40 hours a week on data entry. Drones also speed field capture: work that once took days now takes minutes, and DFW Airport estimates 85% time savings. DFW Airport also uses Forms to track quantities and feed data into Cost Management for payments, with the goal of paying an invoice within 28 days after quality verification. Robert Brown, Senior Project Control Systems Manager at DFW Airport, said the single source of truth keeps teams accountable and on track, regardless of who is coming on or off a project. In one example, a contractor hit a pipe and water spread across a service roadway; an inspector created an issue in Autodesk Build, assigned it automatically to the construction manager, and the construction manager, project manager, and assistant project manager were on site within minutes.

## How does centralized data support capital planning and predictive maintenance?
Centralized data helps DFW Airport make better capital planning and maintenance decisions by preserving asset details throughout the project lifecycle. DFW Airport can capture information such as the date pavement was poured in Autodesk Build, then use Autodesk Tandem and as-built data to decide when replacement is more cost-effective than continued maintenance. Because DFW Airport assesses its entire roadway system every six months, having accurate asset records helps the airport move from reactive maintenance toward predictive maintenance and plan roadwork based on actual usage. The same stored data also gives operations teams direct access to equipment information without sorting through paper files. Bill Grozdanich said Autodesk Construction Cloud breaks down silos and provides full visibility into where capital projects and programs stand at any given time, helping DFW Airport manage design and construction more diligently, make quicker decisions, and operate in a safer, more efficient, and sustainable manner.

## Frequently asked questions

### How can a large airport centralize design, construction, and asset data so capital planning and maintenance are based on one source of truth?

DFW Airport uses Autodesk Construction Cloud with Autodesk Docs, Autodesk Build, and Autodesk Tandem to connect design, construction, and asset records in one tech stack.

[Direct link](https://theintelligencelibrary.com/autodesk/how-dfw-airport-uses-autodesk-construction-cloud-for-capital/#how-can-a-large-airport-centralize-design-construction-and-asset-data-so-capital-planning-and-maintenance-are-based-on-one-source-of-truth)

### What is a practical way for an airport to coordinate hundreds of stakeholders across dozens or hundreds of active projects?

DFW Airport gives unlimited users access in Autodesk Construction Cloud, sets permissions by role, and routes the right information to contractors, designers, engineers, and partners at the right time.

[Direct link](https://theintelligencelibrary.com/autodesk/how-dfw-airport-uses-autodesk-construction-cloud-for-capital/#what-is-a-practical-way-for-an-airport-to-coordinate-hundreds-of-stakeholders-across-dozens-or-hundreds-of-active-projects)

### How do airport teams improve QA/QC when multiple design and construction teams are working on a massive campus at the same time?

DFW Airport standardizes folders in Autodesk Docs and uses the Autodesk Validation Tool to review models against customized criteria before approved models move forward.

[Direct link](https://theintelligencelibrary.com/autodesk/how-dfw-airport-uses-autodesk-construction-cloud-for-capital/#how-do-airport-teams-improve-qa-qc-when-multiple-design-and-construction-teams-are-working-on-a-massive-campus-at-the-same-time)

### How can facilities and capital planning teams share the same data instead of working from separate systems for projects and asset management?

DFW Airport captures as-built data during projects and stores it in Autodesk Build and Autodesk Tandem so operations, maintenance, and capital planning can use the same asset record.

[Direct link](https://theintelligencelibrary.com/autodesk/how-dfw-airport-uses-autodesk-construction-cloud-for-capital/#how-can-facilities-and-capital-planning-teams-share-the-same-data-instead-of-working-from-separate-systems-for-projects-and-asset-management)

### What are the benefits of using Autodesk Construction Cloud for airport capital programs that have a lot of concurrent projects?

DFW Airport says Autodesk Construction Cloud creates a single source of truth, improves accountability, speeds up reviews, and saves time in the field and in project coordination.

[Direct link](https://theintelligencelibrary.com/autodesk/how-dfw-airport-uses-autodesk-construction-cloud-for-capital/#what-are-the-benefits-of-using-autodesk-construction-cloud-for-airport-capital-programs-that-have-a-lot-of-concurrent-projects)

### How do transportation infrastructure owners use centralized data to support both growth projects and long-term maintenance needs?

DFW Airport uses captured asset details, such as pavement pour dates and other as-built information, to support predictive maintenance, roadway replacement timing, and future capital planning.

[Direct link](https://theintelligencelibrary.com/autodesk/how-dfw-airport-uses-autodesk-construction-cloud-for-capital/#how-do-transportation-infrastructure-owners-use-centralized-data-to-support-both-growth-projects-and-long-term-maintenance-needs)


---

[Download the guide (PDF)](https://theintelligencelibrary.com/downloads/how-dfw-airport-uses-autodesk-construction-cloud-for-capital.pdf?utm_source=theintelligencelibrary&utm_medium=referral&utm_content=how-dfw-airport-uses-autodesk-construction-cloud-for-capital)

Published by [Autodesk](https://www.autodesk.com/?utm_source=theintelligencelibrary&utm_medium=referral&utm_content=how-dfw-airport-uses-autodesk-construction-cloud-for-capital).
